Week 18: Painting and more

Mon 9 Dec 2013 - 15 Dec 2013

Monday: This week SS told us is the week for painting. At the same time there are few things for the tiler to finish as well. We'll post some pictures later in the week when we visited the site.

Monday update: dotgif reported to us that and I quote ".. at 10:15am and saw several vehicles there: a van backed onto your future driveway, 2 utes out front and a car. I saw one tradie near the rear-side window of the leisure room performing brush stroke-like movements so can only assume painting has commenced?"
YAY. Painting has commenced just as SS told us. Thanks dotgif..

Wednesday: Today DW visited the site and reported that kitchen caesarstone has been installed. All the vanity sink and caesarstone all done. Tiles around the bathrooms are done, except the grouts. Most of the internal areas including ceilings and walls are all painted. More pictures a bit later.

Thursday: Today I met with WH landscapes to finalise the landscape plan which includes retaining wall, site prep and driveway. Meanwhile electricians were installing the sockets, light battens, cooker exhaust, all my data point etc. tillers grout most of the tiles. 

Cat6 data point terminates

Ensuite nische

Ensuite

Stairs hand rail painted. 

Powder room

Light battens installed in kitchen

Exhaust for cooker installed. 








Sunday, November 17, 2013

Week 15: Lock up and kitchen cabinetry

Mon 18 Nov 2013 - Sun 24 Nov 2013

The plans for this week are continue cornices, doors to be delivered, carpenter to install doors, garage door scheduled for delivery this week which SS mentioned that usually the date and time is unreliable :-), waterproofing, kitchen cabinet booked in for this week too. So many things are going on this week. We shall see. 

Monday:
Front door installed. Garage door not yet delivered so not fully locked up yet. 

Tuesday: some pictures from Tuesday afternoon. Thanks to dotgif. 



Wednesday: got news that garage door is installed. Kitchen cabinetry is also installed. 


The garage door is in Colorbond Dune







Friday, February 1, 2013

Our Colour Selections

This is our colour selection:

Bricks: Austral - Symmetry Earth
Roof: Bristile Coal Classic Shingle
Fascia/Gutter: Dune/Monument
Garage Door: Panel Lift Profile - Contemporary in Dune
Driveway: Bluestone
Moroka Finish: Coffee Cake

Kitchen:
CaesarStone: Snow
Cabinet: Poly Laminex White on top and Laminex Nocturne Oak on the bottom

Bathroom and Laundry:
CaesarStone: Urban
Cupboard: Laminex Burnished Wood

Window: Pearl White

Wall: Taubmans Martini
Stairwell Wall: Taubmans Woodland Grove

Carpet: Redbook Green - Natural Haven - Stairs and First Fl
TimberFloor: Timbernate Brushbox - Most Ground Fl


we chose the middle silverry one